Asad’s Power Quote
If a scope has to be curtailed then first look to get rid of requirements with higher costs and lesser benefits
Asad’s Power Quote
Think of WBS dictionary as work package dictionary which defines the overall scope of the work package.
Asad’s Power Quote
Remember when using Schedule compression techniques, ‘Crashing’ often results in increased cost while ‘Fast Tracking’ often results in increased risks.
Asad’s Power Quote
Do perform schedule compression during ‘Develop Schedule’ process but don’t forget to update ARR(Activity Resource Requirements)
Asad’s Power Quote
Quality Assurance is the ‘king’ of the Project Quality Management Knowledge Area. It takes some of the outputs of Quality Plan and Quality Control and can also use their tools too while having its own tools of Audit and Process Analysis.
Asad’s Power Quote
A good Project Management Methodology (PMM) instills structure to the project life cycle thus driving consistency and yielding better predictability of results.